Tuesday, September 29, 2009

Finished Photo

This is the completed heater in Shelburne. It takes a while before all the loose ends on some projects are tidied up and the surrounding details are completed.
Clay plaster floor to ceiling on the heater body and large surrounding updraft channel mass. Red and blue glass tile detailing on floor level "kick board", around doors, and under black granite capping stone.
This is a fairly large heater and will have high output when in regular use. It will be interesting to see how even the surface temperature in the large updraft masses turn out to be, and to see what I'll be able to learn about gas flows are a result. The heater has been test fired and performed very well even on a hot day with all the windows and doors in the house wide open.